Check timer wiring
Confirm the relay, contactor, light, or table power path and any existing coin timer.
Pool table timer control
Use QuLink when a pool table, billiard table, game room, or table-service device needs QR payment or app approval to start a timed session, control lights or power, and report session results.
Part of Pulse Relay Controller for Laundry and Timed Machines
Project fit
Integration model
QuLink activates a relay for the table, light, or power circuit, runs the session timer, and reports start, end, extension, and fault events.
Workflow
Confirm the relay, contactor, light, or table power path and any existing coin timer.
Define price, duration, extension rules, and stop behavior.
QuLink activates the output after payment or server approval.
Your backend receives start, end, extension, and fault events.
API example
The exact command fields depend on machine interface, firmware profile, and whether payment or your own app triggers the action.
POST /v1/devices/POOL-08/commands
{
"command": "start_session",
"source": "qr_payment",
"reference_id": "POOL-ORDER-008",
"machine_action": {
"type": "relay",
"duration_ms": 3600000
}
}
Project RFQ
Send the timer or relay photo, table and light wiring, price and duration rules, target payment flow, and venue quantity.
If you are unsure about the exact interface, send what you have. Photos often answer more than a long spec.
FAQ
Often yes if the existing timer or table controller accepts a relay, pulse, or dry-contact start signal.
Yes when a suitable relay channel and wiring are available. The sample test confirms the circuit.
Yes. Your app or backend can send an extension command if the project allows it.
Yes. Session start, end, duration, fault, and online status can be uploaded.
Related use cases